期刊


ISSN0953-7287
刊名Production Planning & Control
参考译名生产规划与控制
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

1999, vol.10, no.1 1999, vol.10, no.2 1999, vol.10, no.3 1999, vol.10, no.4 1999, vol.10, no.5 1999, vol.10, no.6
1999, vol.10, no.7 1999, vol.10, no.8

题名作者出版年年卷期
Y2K contingency planningWe-Min Chow19991999, vol.10, no.8
The Y2K problem: manufacturing inputs at riskRonald E. McGaughey; A. Gunasekaran19991999, vol.10, no.8
The role of advanced start and dominance rules in simulated annealing for parallel processor scheduling problemsAdar A. Kalir; Subhash C. Sarin19991999, vol.10, no.8
'The flexible landscape': a model for explaining operational mix and volume flexibilityTerje Skarlo19991999, vol.10, no.8
International standard for denotation of calendar timeKent Lund19991999, vol.10, no.8
An aggregate production planning model with demand under uncertaintyO. S. Silva Filho19991999, vol.10, no.8
A simulated annealing algorithm for job shop schedulingS. G. Ponnambalam; N. Jawahar; P. Aravindan19991999, vol.10, no.8
A modified internal rate of return model for capital rationing in project selectionEdem O. P. Akpan19991999, vol.10, no.8
A machine-learning approach for a sintering process using a neural networkIchiro Shigaki; Hiroshi Narazaki19991999, vol.10, no.8
A heuristic algorithm for minimizing maintenance workforce levelSoo Y. Chang; Yushin Hong; Joong H. Kim; Xere Kim19991999, vol.10, no.8
12345678