期刊


ISSN0953-7287
刊名Production Planning & Control
参考译名生产规划与控制
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

1999, vol.10, no.1 1999, vol.10, no.2 1999, vol.10, no.3 1999, vol.10, no.4 1999, vol.10, no.5 1999, vol.10, no.6
1999, vol.10, no.7 1999, vol.10, no.8

题名作者出版年年卷期
A distributed systems model for estimation of printed circuit board fabrication costsAshutosh Agrawal; Robert J. Graves19991999, vol.10, no.7
A heuristic for scheduling in a flowshop with the bicriteria of makespan and maximum tardiness minimizationKarunakaran Chakravarthy; Chandrasekharan Rajendran19991999, vol.10, no.7
An echelon inventory-based single-stage cost function for a two-station tandem systemJose A. A. Moreira; Carlos F. G. Bispo19991999, vol.10, no.7
Design pattern for deadlock handling in holonic manufacturing systemsJo Wyns; Hendrik van Brussel; Paul Valckenaers19991999, vol.10, no.7
Effect of forecast errors on rolling horizon master production schedule cost performance for various replanning intervalsRay Venkataraman; Jay Nathan19991999, vol.10, no.7
Evolutionary decision support for distributed virtual design in modular product manufacturingRaj Subbu; Arthur C. Sanderson; Cem Hocaoglu; Robert J. Graves19991999, vol.10, no.7
Flexible reasoning using sensible agent-based systems: a case study in job flow schedulingK. S. Barber; T. H. Liu; A. Goel; S. Ramaswamy19991999, vol.10, no.7
Hybrid approach to decision-making for job-shop schedulingK. Mesghouni; P. Pesin; D. Trentesaux; S. Hammadi; C. Tahon; P. Borne19991999, vol.10, no.7
Layered supervisory control architecture for reconfigurable automationBrian L. Huff; Chris R. Edwards19991999, vol.10, no.7
Multiproduct multistage production scheduling (MMPS) for manufacturing systemsM. F. Carvalho; C. A. O. Fernandes; P. A. V. Ferreira19991999, vol.10, no.7