期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2002, vol.19, no.1 2002, vol.19, no.10 2002, vol.19, no.11 2002, vol.19, no.12 2002, vol.19, no.2 2002, vol.19, no.3
2002, vol.19, no.4 2002, vol.19, no.5 2002, vol.19, no.6 2002, vol.19, no.7 2002, vol.19, no.8 2002, vol.19, no.9
2002, vol.20, no.1 2002, vol.20, no.10 2002, vol.20, no.11 2002, vol.20, no.12 2002, vol.20, no.2 2002, vol.20, no.3
2002, vol.20, no.4 2002, vol.20, no.5 2002, vol.20, no.6 2002, vol.20, no.7 2002, vol.20, no.8 2002, vol.20, no.9

题名作者出版年年卷期
Wear and tool life of CBN cutting toolsA. G. Mamalis; J. Kundrak; M. Horvath20022002, vol.20, no.7
Analytical method of process capability for steelWen-Pei Sung; Kuen-Suan Chen; Cheer Germ Go20022002, vol.20, no.7
Thermal error measurement and real time compensation system for the CNC machine tools incorporating the spindle thermal error and the feed axis thermal errorH. J. Pahk; S. W. Lee20022002, vol.20, no.7
Object modelling of multiple views using dual quaternion in reverse engineeringT. Xiaodong; W. Hui; Z. Xionghui; R. Xueyu20022002, vol.20, no.7
Application of the maximal spanning tree approach for machine cell formationG. Prabhakaran; M. Sachithanandam; N. Venkiah20022002, vol.20, no.7
Integrated production model in agile manufacturing systemsH. -H. Huang20022002, vol.20, no.7
Performance assessment of processing and delivery times for very large scale integration using process capability indicesK. S. Chen; H. T. Chen; Lee-Ing Tong20022002, vol.20, no.7
Attribute selection for neural network-based adaptive scheduling systems in flexible manufacturing systemsY. -R. Shiue; C. -T. Su20022002, vol.20, no.7
A fast and reliable tool for estimates for plastic blowing mouldsZ. Bouaziz; J. B. Younes; A. Zghal20022002, vol.20, no.7