知识中心主页
文献服务
文献资源
外文期刊
外文会议
专业机构
智能制造
高级检索
版权声明
使用帮助
期刊
ISSN
0268-3768
刊名
The International Journal of Advanced Manufacturing Technology
参考译名
先进制造技术国际杂志
收藏年代
1998~2024
全部
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2006, vol.27, no.11-12
2006, vol.27, no.3-4
2006, vol.27, no.5-6
2006, vol.27, no.7-8
2006, vol.27, no.9-10
2006, vol.28, no.11-12
2006, vol.28, no.1-2
2006, vol.28, no.3-4
2006, vol.28, no.5-6
2006, vol.28, no.7-8
2006, vol.28, no.9-10
2006, vol.29, no.11-12
2006, vol.29, no.1-2
2006, vol.29, no.3-4
2006, vol.29, no.5-6
2006, vol.29, no.7-8
2006, vol.29, no.9-10
2006, vol.30, no.11-12
2006, vol.30, no.1-2
2006, vol.30, no.3-4
2006, vol.30, no.5-6
2006, vol.30, no.7-8
2006, vol.30, no.9-10
2006, vol.31, no.1-2
2006, vol.31, no.3-4
2006, vol.31, no.5-6
题名
作者
出版年
年卷期
Behavioural modelling for design decomposition and design equations derivation
Y.-M. Deng; D. Zheng
2006
2006, vol.29, no.11-12
Flank milling of a ruled surface with conical tools - an optimization approach
Chenggang Li; Sanjeev Bedi; Stephen Mann
2006
2006, vol.29, no.11-12
Time series modeling and spectrum analysis for chatter mode in endmilling dynamics
Moon-chill Yoon; Do-hun Chin
2006
2006, vol.29, no.11-12
A microslip model of the bonding process in ultrasonic wire bonders, part II: steady teady state response
C. M. Hu; N. Guo; H. Du; X. M. Jian
2006
2006, vol.29, no.11-12
Enhanced STL
Tong Wu; Edmund H. M. Cheung
2006
2006, vol.29, no.11-12
A compact data structure for implementing loop subdivision
Shiqi Ou; Hongzan Bin
2006
2006, vol.29, no.11-12
Application of mahalanobis distance as a lean assessment metric
Jayanth Srinivasaraghavan; Venkat Allada
2006
2006, vol.29, no.11-12
A new offset algorithm for closed 2D lines with Islands
Hyun-Chul Kim; Sung-Gun Lee; Min-Yang Yang
2006
2006, vol.29, no.11-12
An accurate three-dimensional scanning system with a new phase error compensation method
Jiang Tao; Xi Juntong; Yan Junqi
2006
2006, vol.29, no.11-12
A branch and bound procedure for the reentrant permutation flow-shop scheduling problem
Jen-Shiang Chen
2006
2006, vol.29, no.11-12
1
2
制造业外文文献服务平台