期刊


ISSN0951-192X
刊名International Journal of Computer Integrated Manufacturing
参考译名国际计算机集成制造杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2006, vol.19, no.1 2006, vol.19, no.2 2006, vol.19, no.3 2006, vol.19, no.4 2006, vol.19, no.5 2006, vol.19, no.6
2006, vol.19, no.7 2006, vol.19, no.8

题名作者出版年年卷期
A CORBA- and MAS-based architecture for agile collaborative manufacturing systemsY. RAO; P. LI; X. SHAO; B. WU; B. LI20062006, vol.19, no.8
Development of a web-based collaboration platform for manufacturing product and process design evaluation using virtual reality techniquesM. PAPPAS; V. KARABATSOU; D. MAVRIKIOS; G. CHRYSSOLOURIS20062006, vol.19, no.8
Quality of service for CAMX middlewareI. M. DELAMER; J. L. MARTINEZ LASTRA20062006, vol.19, no.8
Automatic assembly sequence planning from STEP CAD filesC. PAN; S. S. SMITH; G. C. SMITH20062006, vol.19, no.8
A simulation-based hybrid backwards scheduling framework for manufacturing systemsC. LALAS; D. MOURTZIS; N. PAPAKOSTAS; G. CHRYSSOLOURIS20062006, vol.19, no.8
A responsive demand management framework for the minimization of waste in convenience food manufactureR. DARLINGTON; S. RAHIMIFARD20062006, vol.19, no.8
Organizational knowledge encapsulation and re-use in collaborative product developmentW. M. CHEUNG; D. G. BRAMALL; P. G. MAROPOULOS; J. X. GAO; H. AZIZ20062006, vol.19, no.7
Computer simulation of wire-EDM taper-cuttingJ. A. SANCHEZ; S. PLAZA; L. N. LOPEZ DE LACALLE; A. LAMIKIZ20062006, vol.19, no.7
Coordinating product configuration in the order fulfilment processing: an approach based on the binary tree algorithmH.-E. TSENG; C.-C. CHEN20062006, vol.19, no.7
Advanced planning and scheduling systems in aluminium conversion industryF. DAVID; H. PIERREVAL; C. CAUX20062006, vol.19, no.7
1234567