期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2007, vol.31, no.11-12 2007, vol.31, no.7-8 2007, vol.31, no.9-10 2007, vol.32, no.11-12 2007, vol.32, no.1-2 2007, vol.32, no.3-4
2007, vol.32, no.5-6 2007, vol.32, no.7-8 2007, vol.32, no.9-10 2007, vol.33, no.11-12 2007, vol.33, no.1-2 2007, vol.33, no.3-4
2007, vol.33, no.5-6 2007, vol.33, no.7-8 2007, vol.33, no.9-10 2007, vol.34, no.11-12 2007, vol.34, no.1-2 2007, vol.34, no.3-4
2007, vol.34, no.5-6 2007, vol.34, no.7-8 2007, vol.34, no.9-10

题名作者出版年年卷期
A real-time NURBS motion interpolator for position control of a slide equilateral triangle parallel manipulatorHua-Yi Chuang; Kuo-Hua Chien20072007, vol.34, no.7-8
Evaluation of CIM technologies in Saudi industries using AHPA. M. A. Al-Ahmari20072007, vol.34, no.7-8
Applications of Petri nets in production scheduling: a reviewGonca Tuncel; G. Mirac Bayhan20072007, vol.34, no.7-8
Work-in-process scheduling by evolutionary tuned fuzzy controllersN. Tsourveloudis; L. Doitsidis; S. Ioannidis20072007, vol.34, no.7-8
A laplace-based spiral contouring method for general pocket machiningJui-Jen Chuang; Daniel C. H. Yang20072007, vol.34, no.7-8
Two-machine flowshop scheduling to minimize mean flow time under simple linear deteriorationYau-Ren Shiau; Wen-Chiung Lee; Chin-Chia Wu; Chia-Ming Chang20072007, vol.34, no.7-8
Effects of the cutting feed, depth of cut, and workpiece (bore) diameter on the tool wear rateViktor P. Astakhov20072007, vol.34, no.7-8
Cost optimization of process tolerance allocation-a tree based approachP. Kumaravel; S. Anand; U. Ullas; P. V. Mohanram20072007, vol.34, no.7-8
Finishing effect of abrasive flow machining on micro slit fabricated by wire-EDMHsinn-Jyh Tzeng; Biing-Hwa Yan; Rong-Tzong Hsu; Han-Ming Chow20072007, vol.34, no.7-8
Research on immune genetic algorithm for solving the job-shop scheduling problemXiao-dong Xu; Cong-xin Li20072007, vol.34, no.7-8
12