知识中心主页
文献服务
文献资源
外文期刊
外文会议
专业机构
智能制造
高级检索
版权声明
使用帮助
期刊
ISSN
0360-8352
刊名
Computers & Industrial Engineering
参考译名
计算机与工业工程
收藏年代
1999~2023
全部
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2012, vol.62, no.1
2012, vol.62, no.2
2012, vol.62, no.3
2012, vol.62, no.4
2012, vol.63, no.1
2012, vol.63, no.2
2012, vol.63, no.3
2012, vol.63, no.4
题名
作者
出版年
年卷期
Location allocation modeling for healthcare facility planning in Malaysia
S. S. Radiah Shariff; Noor Hasnah Moin; Mohd Omar
2012
2012, vol.62, no.4
Three m-failure group maintenance models for M/M/N unreliable queuing service systems
Gia-Shie Liu
2012
2012, vol.62, no.4
Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy
Simone Zanoni; Anders Segerstedt; Ou Tang; Laura Mazzoldi
2012
2012, vol.62, no.4
Combining fuzzy weight average with fuzzy inference system for material substitution selection in electric industry
Kuo-Ping Lin; Hung-Pin Ho; Kuo-Chen Hung; Ping-Feng Pai
2012
2012, vol.62, no.4
Analysis on multi-stage lot streaming: The effect of transfer
Taofeng Ye
2012
2012, vol.62, no.4
A genetic algorithm with the heuristic procedure to solve the multi-line layout problem
Amir Sadrzadeh
2012
2012, vol.62, no.4
Interoperability of manufacturing applications using the Core Manufacturing Simulation Data (CMSD) standard information model
Ryan Bloomfield; Esfandyar Mazhari; Joseph Hawkins; Young-Jun Son
2012
2012, vol.62, no.4
A beam search heuristics to solve the parcel hub scheduling problem
Douglas L. McWilliams; Maranda E. McBride
2012
2012, vol.62, no.4
Neural networks for detecting cyclic behavior in autocorrelated process
Ussanee Purintrapiban; H. W. Corley
2012
2012, vol.62, no.4
Tabu search and lower bound for an industrial complex shop scheduling problem
D. Prot; O. Bellenguez-Morineau
2012
2012, vol.62, no.4
1
2
3
制造业外文文献服务平台