期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2012, vol.58, no.1/4 2012, vol.58, no.5/8 2012, vol.58, no.9/12 2012, vol.59, no.1/4 2012, vol.59, no.5/8 2012, vol.59, no.9/12
2012, vol.60, no.1/4 2012, vol.60, no.5/8 2012, vol.60, no.9/12 2012, vol.61, no.1/4 2012, vol.61, no.5/8 2012, vol.61, no.9/12
2012, vol.62, no.1/4 2012, vol.62, no.5/8 2012, vol.62, no.9/12 2012, vol.63, no.1/4 2012, vol.63, no.5/8 2012, vol.63, no.9/12

题名作者出版年年卷期
Study on direct fabrication of ceramic shell mold with slurry-based ceramic laser fusion and ceramic laser sinteringHsiao Chuan Yen; Hwa Hsing Tang20122012, vol.60, no.9/12
A hybrid-constrained MOGA and local search method to optimize the load path for tube hydroformingHonggang An; Daniel E. Green; Jennifer Johrendt20122012, vol.60, no.9/12
A new adaptive control chart for monitoring process mean and variabilityJiujun Zhang; Zhonghua Li; Zhaojun Wang20122012, vol.60, no.9/12
Non-contact, in-line inspection of surface finish of crankshaft journalsHagay Bamberger; En Hong; Reuven Katz; John S. Agapiou; Susan M. Smyth20122012, vol.60, no.9/12
A joint model of production scheduling and predictive maintenance for minimizing job tardinessErshun Pan; Wenzhu Liao; Lifeng Xi20122012, vol.60, no.9/12
Multi-objective swarm-based neighborhood search for fuzzy flexible job shop schedulingYou-lian Zheng; Yuan-xiang Li; De-ming Lei20122012, vol.60, no.9/12
Bat intelligence search with application to multi-objective multiprocessor scheduling optimizationBehnam Malakooti; Hyun Kim; Shaya Sheikh20122012, vol.60, no.9/12
A greedy heuristic and simulated annealing approach for a bicriteria flowshop scheduling problem with precedence constraints - a practical manufacturing caseSamer Hanoun; Saeid Nahavandi20122012, vol.60, no.9/12
Scheduling identical parallel machines with machine eligibility restrictions to minimize total weighted flowtime in automobile gear manufacturingRavindra Gokhale; M. Mathirajan20122012, vol.60, no.9/12
An enhanced Pareto-based artificial bee colony algorithm for the multi-objective flexible job-shop schedulingLing Wang; Gang Zhou; Ye Xu; Min Liu20122012, vol.60, no.9/12
1234