期刊


ISSN0268-3768
刊名The International Journal of Advanced Manufacturing Technology
参考译名先进制造技术国际杂志
收藏年代1998~2024



全部

1998 1999 2000 2001 2002 2003
2004 2005 2006 2007 2008 2009
2010 2011 2012 2013 2014 2015
2016 2017 2018 2019 2020 2021
2022 2023 2024

2012, vol.58, no.1/4 2012, vol.58, no.5/8 2012, vol.58, no.9/12 2012, vol.59, no.1/4 2012, vol.59, no.5/8 2012, vol.59, no.9/12
2012, vol.60, no.1/4 2012, vol.60, no.5/8 2012, vol.60, no.9/12 2012, vol.61, no.1/4 2012, vol.61, no.5/8 2012, vol.61, no.9/12
2012, vol.62, no.1/4 2012, vol.62, no.5/8 2012, vol.62, no.9/12 2012, vol.63, no.1/4 2012, vol.63, no.5/8 2012, vol.63, no.9/12

题名作者出版年年卷期
Development of an algorithm for optimum control process to compensate the nozzle wear effect in cutting the hard and tough material using abrasive water jet cutting processMehdi Zohoor; S. Hadi Nourian20122012, vol.61, no.9/12
Development and characterization of a novel piezoelectric-driven stick-slip actuator with anisotropic-friction surfacesQ. S. Zhang; X. B. Chen; Q. Yang; W. J. Zhang20122012, vol.61, no.9/12
Deformation and stress of a composite-metal assemblyChensong Dong; Lu Kang20122012, vol.61, no.9/12
Composite fabrication using friction stir processing - a reviewH. S. Arora; H. Singh; B. K. Dhindaw20122012, vol.61, no.9/12
Adaptive nonlinear contour coupling control for a machine tool systemJinho Lee; Warren E. Dixon; John C. Ziegert20122012, vol.61, no.9/12
Optimization of variable blank holder force trajectory by sequential approximate optimization with RBF networkSatoshi Kitayama; Kenta Kita; Koetsu Yamazaki20122012, vol.61, no.9/12
ISO manufacturing tolerancing: three-dimensional transfer with analysis line methodBernard Anselmetti20122012, vol.61, no.9/12
A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterionHamed Samarghandi; Tarek Y. ElMekkawy20122012, vol.61, no.9/12
Non-identical parallel machine scheduling with fuzzy processing times using genetic algorithm and simulationSavas Balin20122012, vol.61, no.9/12
Scheduling in a two-machine flow-shop for earliness/tardiness under learning effectMesut Cemil Isler; Bilal Toklu; Veli Celik20122012, vol.61, no.9/12
1234