期刊


ISSN0956-5515
刊名Journal of Intelligent Manufacturing
参考译名智能化制造业杂志
收藏年代1999~2024



全部

1999 2000 2001 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023 2024

2015, vol.26, no.1 2015, vol.26, no.2 2015, vol.26, no.3 2015, vol.26, no.4 2015, vol.26, no.5 2015, vol.26, no.6

题名作者出版年年卷期
Learning and reuse of engineering ramp-up strategies for modular assembly systemsScrimieri, Daniele; Oates, Robert F.; Ratchev, Svetan M.20152015, vol.26, no.6
A graph-based pipe routing algorithm in aero-engine rotational spaceLiu, Qiang; Wang, Chengen20152015, vol.26, no.6
Unrelated parallel-machine scheduling to minimize total weighted completion timeChen, Jeng-Fung20152015, vol.26, no.6
Curve fitting optimization based on a mixed model for assembly applicationsGao Xiang; Wang Hua; Chen Guanlong20152015, vol.26, no.6
Optimization of bone drilling using Taguchi methodology coupled with fuzzy based desirability function approachPandey, Rupesh Kumar; Panda, S. S.20152015, vol.26, no.6
An integrated optimization of location assignment and storage/retrieval scheduling in multi-shuttle automated storage/retrieval systemsYang, Peng; Miao, Lixin; Xue, Zhaojie; Qin, Lei20152015, vol.26, no.6
A rule-based system for trade-off among energy consumption, tool life, and productivity in machining processIqbal, Asif; Zhang, Hong-Chao; Kong, Lu Lu; Hussain, Ghulam20152015, vol.26, no.6
Swarm lexicographic goal programming for fuzzy open shop schedulingJose Palacios, Juan; Gonzalez-Rodriguez, Ines; Vela, Camino R.; Puente, Jorge20152015, vol.26, no.6
A reinforcement learning based approach for a multiple-load carrier scheduling problemXia, Beixin; Zhou, Bing-hai; Xi, Lifeng; Chen, Ci20152015, vol.26, no.6
A process prediction model based on Cuckoo algorithm for abrasive waterjet machiningMohamad, Azizah; Zain, Azlan Mohd; Bazin, Nor Erne Nazira; Udin, Amirmudin20152015, vol.26, no.6
12