期刊


ISSN0305-215X
刊名Engineering Optimization
参考译名工程最优化
收藏年代1998~2023



全部

1998 1999 2000 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2020, vol.52, no.1/3 2020, vol.52, no.10/12 2020, vol.52, no.4/6 2020, vol.52, no.7/9

题名作者出版年年卷期
Min-max regret criterion-based robust model for the permutation flow-shop scheduling problemLiao, Wenzhu; Fu, Yanxiang20202020, vol.52, no.4/6
Research on common due window assignment flowshop scheduling with learning effect and resource allocationShi, Hui-Bin; Wang, Ji-Bo20202020, vol.52, no.4/6
Surrogate-assisted two-phase tensioning strategy optimization for the system transformation process of a cable-stayed bridgeWang, Xiaoming; Wu, Wentao; Liu, Yan; Ran, Zhun20202020, vol.52, no.4/6
Single-machine resource allocation scheduling with due-date assignment, deterioration effect and position-dependent weightsLiu, Weiwei; Yao, Yao; Jiang, Chong20202020, vol.52, no.4/6
Free material optimization with local stress constraints for laminated structuresWeldeyesus, Alemseged Gebrehiwot20202020, vol.52, no.4/6
A two-phase simulation-optimization cellular automata method for sewer network design optimizationZaheri, M. M.; Ghanbari, R.; Afshar, M. H.20202020, vol.52, no.4/6
A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resourceWang, Qiang; Liu, Changchun; Zheng, Li20202020, vol.52, no.4/6
Improved impact responses of a honeycomb sandwich panel structure with internal resonatorsLi, Q. Q.; He, Z. C.; Li, E.; Cheng, A. G.20202020, vol.52, no.4/6
Pareto Explorer: a global/local exploration tool for many-objective optimization problemsSchutze, Oliver; Cuate, Oliver; Martin, Adanay; Peitz, Sebastian; Dellnitz, Michael20202020, vol.52, no.4/6
A mathematical model and tabu search algorithm for multi-manned assembly line balancing problems with assignment restrictionsYilmaz, Hamid; Yilmaz, Mustafa20202020, vol.52, no.4/6
1234