期刊


ISSN0305-215X
刊名Engineering Optimization
参考译名工程最优化
收藏年代1998~2023



全部

1998 1999 2000 2002 2003 2004
2005 2006 2007 2008 2009 2010
2011 2012 2013 2014 2015 2016
2017 2018 2019 2020 2021 2022
2023

2017, vol.49, no.1/3 2017, vol.49, no.10/12 2017, vol.49, no.4/6 2017, vol.49, no.7/9

题名作者出版年年卷期
Parallel implementations of the Complex-RF algorithmBraun, R.; Krus, P.20172017, vol.49, no.7/9
Cooperative parallel adaptive neighbourhood search for the disjunctively constrained knapsack problemQuan, Zhe; Wu, Lei20172017, vol.49, no.7/9
A novel algorithm using an orthotropic material model for topology optimizationTong, Liyong; Luo, Quantian20172017, vol.49, no.7/9
A region-segmentation combining surrogate model based on L-indicator and N-fold cross-validation techniqueLu, Hanan; Li, Qiushi; Pan, Tianyu20172017, vol.49, no.7/9
Energy absorption evaluation of reinforced concrete beams under various loading rates based on particle swarm optimization techniqueHanoon, Ammar N.; Jaafar, M. S.; Hejazi, Farzad; Aziz, Farah N. A. Abdul20172017, vol.49, no.7/9
An improved immune algorithm for optimizing the pulse width modulation control sequence of invertersSheng, L.; Qian, S. Q.; Ye, Y. Q.; Wu, Y. H.20172017, vol.49, no.7/9
An extension of the directed search domain algorithm to bilevel optimizationWang, Kaiqiang; Utyuzhnikov, Sergey V.20172017, vol.49, no.7/9
An inexact fuzzy bi-level programming model for energy-traffic system planning under uncertainty: a case study of Urumqi city, ChinaWang, S.; Huang, G. H.; Yao, Y.; Xie, Y. L.; Zhen, J. L.20172017, vol.49, no.7/9
Increasing production rate in U-type assembly lines with sequence-dependent set-up timesSahin, Murat; Kellegoz, Talip20172017, vol.49, no.7/9
Single-machine common/slack due window assignment problems with linear decreasing processing timesZhang, Xingong; Lin, Win-Chin; Wu, Wen-Hsiang; Wu, Chin-Chia20172017, vol.49, no.7/9
12345678910...